Luckett - Sunshine Studies

DOT's Construction &
Right-of-Way Plans
Search Page.....
View and Print plans.

Iona Drainage District Book

Countywide Resurfacing Roadway Improvement
Lehigh Acres FY/2009
Project Memorandum -
D.O.T. Public Workshops
Sidewalk Project Summary
Ben Pratt-Six Mile Cypress
Exhibits and Plans
All Current Roadway Project
CIP Project Summary
November 2007

Projects Progress Pictures

Download Project Plans

 
DOT Resources:
Go
Departments:
Go
Contractor's Online Forms:
Go
 

Citizen Help Line: (239) 533-2737
E Mail: webmaster@leegov.com
©2004 Lee County Official Website
   

 

Download Project Plans: Last up-date 11/18/2009
These are files that can be viewed and printed using the free Adobe Acrobat Reader
 12th Street West Sidewalk from Gunnery Rd. to Sunshine Blvd.
 Alico Road Connector Alignment Study Alico Rd. to SR 82 
 Complete Appendix - Final Report from McMahon 07/01/09
 Ben C. Pratt Six Mile Cypress Pkwy. (Stimulus_Plans-Nov2009) Four Laning "Preliminary Plans"

 Boca Grande As- Built Drainage System Improvement Plans.

 Bonita Beach Road. from Old US 41 to Lime St. Proj. #4044  100% Submittal
 Bonita Beach Rd. Phase III US 41 to Old US 41 60% Submitted
 Bonita Grande Drive at Bonita Beach Road Intersection
 Cape Coral Pkwy. and Del Prado Blvd. Intersection Improvements
 Colonial Blvd. (CR 846) Six Laning  I-75 to SR. 82   (Bid Set, Revisions 1 and 2)
 Colonial Blvd. / Metro Pkwy. Queue Jump
 Colonial Blvd. Project Development and Environment (PD&E) Study
 Corkscrew Road East of Ben Hill Griffin Parkway
 Daniels Pkwy. at Treeline Ave. Dual Eastbound to Northbound Turn
 Lanes
-
Signed and Sealed - 100% Submittal
 Del Prado Blvd - Median Safety Improvement - SE 44th St. to SE 41st St. 100%
 Submittal,      Exhibits: Presentation Median & Aerial of Del Prado Roads Project
 Estero Parkway Phase I Road Improvements
 Glenwood Avenue Sidewalk - 100% Submittal
 Gunnery Road - Lee Blvd. to North of SR. 82, 100% Submittal
 Homestead Road  Alabama Blvd. to South of Sunrise Blvd. - Phase IV 100%
 Homestead Road  Alabama Blvd. to South of Sunrise Blvd. - Right of Way Plans
 Imperial Street - Bonita Beach to East Terry Street.
 Oriole Road Extension
 Plantation Road Extension - 100% Submittal
 Six Mile Cypress Pathways 
 Slater Road Sidewalk Improvements - Bayshore Rd.(SR78) to Mellow Ln.
 S.R. 82 and Daniels Pkwy.  100% Submittal
 Williams Road. Sidewalk 100% Submittal ( 24" x 36" )
Bi-County Study-Burnt Store Rd, Veterans Pkwy. & Colonial Blvd.
  Corridor Study
  Phase I Final Report
  Phase II Concept  Report
  Phase II Concept Plans
  Phase II Technical Appendix
  Financial Analysis Technical Report
Burnt Store Road Widening
  Burnt Store Road Widening 30% Submittal

Gladiolus Widening :

Gladiolus Drive Displays
 
Gladiolus - Pine Ridge Rd.
to AW Bulb Rd.
Gladiolus - AW Bulb Rd.
to Bass Rd.
Gladiolus - Bass Rd.
to Winkler Rd.

Phase I

Phase II

Gladiolus Ph I Roadway Gladiolus Ph II Roadway
Gladiolus Ph I Signing Marking Gladiolus Ph II Signing Marking
Gladiolus Ph I Signals Gladiolus Ph II Signals
Gladiolus Ph I Lighting Gladiolus Ph II Lighting
Gladiolus Ph I Structure Gladiolus ROW
Ortiz Ave. from SR. 82 (MLK) to SR. 80 (Palm Beach Blvd.)
NOTES TO REVIEWER PH II
Roadway Plans - 60% Submittal
Structures Plans - 30% Submittal
Lighting Plans - 60% Submittal
Landscape Plans - 60% Submittal
Signing And  Marking - 60% Submittal
Signalization Plans - 60% Submittal
 Summerlin Road Six Laning - Cypress Lake Dr. to Boy Scout Dr.
Summerlin Rd. Six Laning - A. B. & B. Engineers
Summerlin Rd. Utility Plans - CPH Engineers
Summerlin Rd. Bridge Plan Final Submittal - P.H. & A. Engineers
Summerlin Rd  Roadway Plan Final - P. H. & A. Engineers
Summerlin Rd  Spm Final - P. H. & A. Engineers
 Summerlin Road Six Laning - San Carlos Blvd. to Gladiolus Dr.
  Summerlin Rd. Six - Laning
  Summerlin Rd. at San Carlo
  Summerlin Rd. - Utility Adjustments
  Summerlin Rd Inserts
Three Oaks Parkway
Three Oaks Parkway - Airport Canal to Daniels Pkwy. 90% Submittal
Three Oaks Parkway Extension  Alico Rd. to Sta. 163+49.02
Three Oaks Parkway - Corkscrew Rd. to Alico Rd.
Three Oaks South 100% Submittal  Brooks to Imperial St.
Veteran's Pkwy.
Midpoint Corridor - East-West Ext - E Of Se 13 Ave To W Of Santa Barbara Blvd
  Veteran's Pkwy - Sr 78 (Pine Island Rd) To East Of Surfside Blvd - Environmental Permit Construction Phase I - Reduced Plans
Veteran's Pkwy - Sr 78 (Pine Island Rd) To East Of Surfside Blvd - Reduced Plans
Veteran's Pkwy - Sr 78 To E Of Surfside Blvd - Reduced Partial Markings Plan
Veteran's Pkwy - Sr 78 To East Of Surfside Blvd
Veteran's Pkwy West Ext - Santa Barbara Blvd To Chiquita Blvd - As-Built Plans
Veteran's Pkwy West Ext - Santa Barbara Blvd To Chiquita Blvd - Reduced Plans
Downloads: