`

Last up-date 11/02/2011

Cape Coral Bridge Toll Plaza Reconstruction No “Oversized Load” Trucks Permitted
Effective Immediately
Road Completion Street Evaluation, Countywide Resurfacing 2010-2011
How do I get my road paved? For information contact Cindy Pledger at...
CPledger@leegov.com
3-FY/ 2011 Countywide Resurfacing Roadway Improvement, Countywide Arterials & Collectors
2011 Service Volumes
Generalized Peak Hour Directional Service Volumes Urbanized Areas
What is COMPLETE STREETS?
Six Mile Cypress Access Resolution
Lee County DOT Plan Specifications 1/12/2011
Matlacha Bridge Replacement.
Hickory Blvd. Shoulder Project

DOT's Construction & Right-of-Way Plans. Search Page.....
View and Print plans.

1-FY/2011 Countywide Resurfacing Roadway Improvements-Lehigh Acres

2-FY2011 Countywide
Resurfacing Roadway
Improvements
Project Memorandum -
D.O.T. Public Workshops
Sidewalk Project Summary
Ben Pratt-Six Mile Cypress
Exhibits and Plans
All Current Roadway Project
CIP Project Summary
April 21, 2009

Projects Progress Pictures

Download Project Plans

DOT Resources:
Go
Access Resolutions:   
Go
Departments:
Go
Contractor's Online Forms:
Go
 

County Switchboard:(239) 533-2111

E Mail: webmaster@leegov.com
©2004 Lee County Official Website
 

 


Project Related Information...

Estero Boulevard (CR 865) Analysis & Design:
 
   1)
Estero Blvd Analysis & Design: Phase I Report (7,4 MB)
     2)
Estero Blvd Analysis & Design-Appendices-2010-08-01 (47.4 MB)
     3)
Estero Blvd. (CR 865) Analysis & Design: Phase I Report; Executive 
         Summary
(74.7 MB) 

Estero Boulevard (CR 865) Streetscape Master Plan:
     1)
Estero Blvd Streetscape Master Plan (24.7 MB)

Estero Boulevard  (865) Right-of-Way Maps-Survey Plans:
    
1)
 Estero Blvd. Final Right of Way Maps (86.2 MB)
     2) Estero Blvd. Survey Plans (55.7 MB)

LeeTran Report:
     1)
Fort Myers Beach Trolley – Sketch Analysis Final Report (6,774 KB

Town of Fort Myers Beach Stormwater Plans:
    
1) 091019-6 Exhibits 661275
(16.4 MB)
     2) 091019-6 Environmental Resource Permit; Staff Permit and
         Staff Report_618694
(20.9 MB)
     3) 091019-6 Stormwater Quality Improvement Project
         Plans 20091019 550485
(9 MB)
     4) Basin Based Neighborhood Flood Mitigation And Stormwater Quality   
         Improvement Project
(8 MB)

Town requested Interim Improvement List :
 
    1) Planning Level Estero Blvd. Improvement Unit Cost Calculation
(97 KB)
     2) Spot Improvement Cost Estimates Table 1
(56 MB)
     3) Town Of Fort Myers Beach, Florida  Improvement Plan Figures 1 -11
(106 KB)

Town of Fort Myers Beach Water-System:
  
  1) Memo Water Utility Projects 
(484 KB)          
     2) Fort Myers Beach Potable Water Distribution System
(3 MB)

FORT MYERS BEACH-Water Distribution Evaluation-2008-02:
 
    1) Figure A-1 thru Figure A-5 Rehab Phasing
(3.7 MB)
 
 Fort Myers Beach-Water Distribution Evaluation Update-2010-10:   
    
1) Final Evaluation Update Report 2010
(1.9 MB)
     2) Fort Myers Beach Table 11-Water Report  September 2010
(124 KB)
     3) Fort Myers Beach Water Cost Estimates September 2010 (130 KB)
     4) Fort Myers Beach Water System
(203 KB)